Trade Centre – DIFC – Dubai – United Arab Emirates

Project Details

Client Name:

Alix Partners

Contract Value:

150K

Contract Length:

2 weeks

Location:

676J+XG6 – Trade Centre – DIFC – Dubai – United Arab Emirates

Brief:

Phorm were engaged to carry out internal Re-Stack project for Alix Partners within Level 6 office at New Street Square. Works consisted of removing existing partitions, furniture, Doors & Glazing. We were then successful in installing new partition walls and glazed partitions for exec offices, kitchens area and work spaces, ceiling repairs and drop down bulkheads to suit new layout.

Power adaptions were made for desk moves along with some furniture installation. The works were challenging as everything had to be down outside of normal working hours and within a ten day timeframe, meaning extra staff with our core team working long shifts to achieve the end goal.

Creating new office layout though the newly constructed partition walls to give an effective mixture of private work-pods and open communal spaces to allow a better working environment.

Value Added: